Al-Danah Phase 2 Water Treatment Plant – AlMarai |
|
| |
|
|
|
General
Overview Awarded
Date 15
- 9
- 2006
|
|
|
| |
|
Type: |
Reverse Osmosis |
|
Place: |
Al Kharj, K.S.A.
|
|
Overview: |
SF7 Phase two is aimed to increase the water production capacity of Al Danah Farm through the installation of an additional iron removal system and desalination plant |
|
Treatment
System : |
Reverse Osmosis and Iron Removal System |
|
Capacity: |
4000 m3/d (Reverse Osmosis) and 500 m³/hr (Iron Removal) |
|
Contract
Value : |
|
|
Scope: |
Process and related Civil Work design. Equipment sizing, selection, procurement, manufacturing, installation and commissioning (Electromechanical) |
|
|
|
|